Solid Aluminum Panel is one of the most common building materials, and its application range is very wide. If you have a certain understanding of the building, you will be able to see it often, so you will be able to install the aluminum veneer. Do you understand? Next, Solid Aluminum Panel Manufacturer will introduce the installation method of the aluminum veneer and the related knowledge of the installation precautions.

Aluminum veneer installation method

The first step: first fix the skeleton, then place the skeleton on the base of the ballistic base, and firmly fix the skeleton on the main structure. Remember to check the quality of the main structure before releasing the line.

Step 2: Weld the joint on the column of the main structure to fix the skeleton so that the skeleton does not fall.

Step 3: Pre-treat the skeleton before installation. The position of the mounting skeleton should be accurate and the combination should be firm. Install the inspection center line, surface elevation, and so on. In addition, in order to ensure the installation accuracy of the board, it is better to use the theodolite to penetrate the beam girders. Improve the deformation joints, settlement joints, variable section, etc., and finally meet the requirements of use.

Step 4: Finally, when installing the aluminum plate, it should be firm and reliable, and easy to install.

1. The gap between the board and the board should be treated internally to make it smooth and smooth.

2. The aluminum plate is installed and covered with plastic film or other materials in the easily contaminated parts.

Solid Aluminum Panel

  • Tel.: +86 635 358 4833
  • Fax: +86 635 358 6360
  • :
  • E-mail: sevenpanel@sevenpanel.com
  • Add.: Dong E county, Liaocheng city, Shandong Province, China, 252218

Copyright © Dong E Blue Sky and Seven Color Building Materials Co.,Ltd All Rights Reserved | Powered by